Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-0925-00499

Parcel: 14101013E


Addresses:

9981 E LEBARON DR

Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
07/28/2026 RSBU - Building Final  Re-inspection required 07/28/2026
Secure exhaust vent in laundry room - heavy rattle going on. Secure AC electrical whip midway. Could not verify attic equipment and electrical. Conditions paperwork needs to be satisfied.
07/29/2026 RSBU - Building Final  Not Ready Ensure clean out caps are glued. Provide combo smoke detector at entry of garage door per R315.2.2. Exhaust fan in laundry room same issue. Smoke detectors to close to the walls in hall and bedroom 3 along with primary room. Great room area lighting incomplete. Exposed wiring. Ensure condenser unit is leveled. 7/29/2026
07/30/2026 RSBU - Building Final  Passed All corrections were made. 7/30/2026