Inspection Status: Re-inspection required
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/20/2026 |
ENGR Engineering Final
|
|
Re-inspection required |
Paver pathway from parking lot to sales office exceeds 2% cross slope. Paver path to sidewalk exceeds 10% running slope. Must be ADA compliant, 2% cross slope max, 5% running slope max, 8.33% max ramp slope. hand rail required where scupper passes below walkway. Transformer pad needs to be covered. Genset ungrounded. striping required. Cleanouts need to cut and covered. |