Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
Permit Number - TC-MDP-0925-00498
Inspection Description - RSBU - Building Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/20/2026 | RSBU - Building Final | Re-inspection required | 1/20/26: 7458properly secure electrical whip at HVAC Condenser, disconnect at HVAC Condenser requires 36” of clearance in front, Condenser is being over Amped, cut clean outs to grade, post tension tag at hose bib required, secure plastic piping at wall abs coat all exterior plastic piping, threshold at Accessible entrance must be no more than 1/4” vertical and beveled if no more than 1/2”, light switch at garage not working, light switch at den not working, label at dryer vent must be filled out, light switch at living room not working, cover at receptacle missing in master closet, caulking required at toilets, post tension stamp at garage required, accessible route does not meet requirements, no attic access, no garage access, domestic water has not been hooked up, sewer connection has not been made, expansion tank required at water heater due to a closed loop system. Stopped inspection more items may be added. Please call future inspections under commercial permit for sales office and model home (this permit is directly correlated with the SFR) |