Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0924-01147
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Replace fresh air intake due to water trapped. Plastic grommet out of place Igor exhaust fan in laundry room. Provide receptacle for future basin in laundry room. Attic access not meeting the height requirement along with total length to service the unit. Two way at right of SGD has open slots. Gusset plate has been damaged above dining area. Box at south wall of kitchen area and great room area. has an open slot. (Marked locations.) check all marked receptacle boxes. Exhaust fan in south bedroom needs correction. Boxes for Smoke detectors have open slots. Tabs have been pulled out completely. Thermostat required to be at 48” AFF. Missing wall clean outs per plan. Add supports to gas line throughout. Gas line sitting on top of pex near powder room. Flex duct choked in multiple areas. Provide ladder to verify disconnects and other items in attic. 8/6/2025 | |
| 08/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8.15.25 Re walked house. Satisfactory corrections have been made throughout. |