Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/28/2025 | COT - RSBU - Preslab | Re-inspection required | 5-28-25, clean out loose dirt from footings and compact pad throughout. | |
| 05/29/2025 | COT - RSBU - Preslab | Re-inspection required | 5-28-25, clean out loose dirt from footings and compact pad throughout. 5/29/25: reinforcement overlap not per plans, footing width not per plan, workers still cleaning out trenches. |
|
| 05/30/2025 | COT - RSBU - Preslab | Passed | 5-30-25: preslab, excavation/reinforcement/setbacks approved. Okay to pour concrete. |