Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSEL - Electrical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | COT - RSEL - Electrical Final | Re-inspection required | 14 March 25 Not ready, house was locked. |
|
| 03/19/2025 | COT - RSEL - Electrical Final | Re-inspection required | 19 March Full bathroom downstairs is not GFCI protected. |
|
| 03/24/2025 | COT - RSEL - Electrical Final | Passed | 3/24/25 corrections made |