Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0924-01034

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
12/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-6-24, seal tear on vapor barrier at bedroom 4, dwv not under test, pex lines within 12 inches of can lights, missing h-25's at interior load bearing wall. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED.
12/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/10/24 holes in vapor barrier above kitchen window and by sliding glass door, marked. Inappropriate screws in fan boxes, must use provided hex screws. Pex lines still within 12 inches of lights. Light box with 4 switches must be braced on both sides. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE NOTED.
12/12/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/12/24 corrections made