Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | ENGR Engineering Final | Not Ready | 8/5/5 1222 13th-Driveway apron in not in. ROW permit is needed to build SD 206 Driveway to plan. An Accessible route to the ROW sidewalk is also needed. 1221 Acuna-An Accessible route to the ROW sidewalk is also needed. |
|
| 08/29/2025 | ENGR Engineering Final | Passed |