Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0924-01012
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/2/25: all plumbing pipes outside thermal envelope must be insulated with minimum R-3, missing receptacle at laundry room, seal all penetrations through top plate, missing smoke detector at kitchen, DWV must be under test, Garage light fixture is exceeding box fill, thermostat shall be no higher than 48" o.c AFF, properly secure exhaust fan flex, garage receptacles must be 12-2 for 20 amp circuit (3) required, proper slope required at HVAC primary and secondary condensate drain, penetration through vapor barrier must be sealed at north east bathroom, mudring required at UFER CONNECTION, transfer air required at north east bedroom 14" flex, seal all area of torn flex sheathing, attic access requirements not met 30" head room clearance, support fresh air intake flex, | ||
| 10/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |