Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0923-01588
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Not ready. Leak at laundry room area. Add nail plates to anything that is less than an 1 1/4". Fire foam all top penetrations. Add blocking at all registers. Missing receptacles at kitchen island. STOPPED INSPECTION. 6/18/2024 | |
06/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Not ready. Leak at laundry room area. Add nail plates to anything that is less than an 1 1/4". Fire foam all top penetrations. Add blocking at all registers. Missing receptacles at kitchen island. STOPPED INSPECTION. 6/18/2024 6/21/24: per previous notes, plenum at first floor needs to be properly sealed, DWV needs support throughout at above ceiling, support on exhaust fan flex, seal penetrations through vapor barrier, refrigerant lines missing, nail strap at refrigerant lines (over notched top plate) |
|
06/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Abs line has been punctured with staples. Insulate water line in garage area. Plenum at first floor needs to be properly sealed. 6/26/2024 | |
06/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Provide DWV TEST to verify the abs line has been taking care of. 6/28/2024 | |
07/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 7/2/2024 |