Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2024 | RSBU - Building Final | Re-inspection required | 7/11/24; all exterior pvc needs to be painted or coated for protection from UV | |
| RSBU - Building Final | Passed |