Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/18/2024 |
ENGR Engineering Final
|
|
Not Ready |
contractor called and it’s not ready. He’s gonna have to reschedule. |
| 06/21/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Final Inspection of this site will be completed on 6/25/2024 to verify that all items for this house has been totally completed for Occupancy. |
| 06/25/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Ok for Level 4 Temporary Certificate of Occupanct at this time but not for the Final. Crews still working on minor repairs to this site and a reinspection will be rescheduled for 6’27/2024. also minor cleaning and clearing of the Streets and Stock piles of material noted at this time. Also sidewalk and driveway repairs still need to be made as needed. |
| 06/27/2024 |
ENGR Engineering Final
|
|
Passed |
|