Inspection Status: Canceled

Inspection History: COT - RSBU - Roof Nailing 

Date Description Inspector Results Comments
07/29/2026 COT - RSBU - Roof Nailing  Canceled Canceled per contractor. 7/29/2026
08/03/2026 COT - RSBU - Roof Nailing  Re-inspection required 08/03/2026
Add sheathing to entrance at piers and steel washer plates to anchor bolts. Add strap at beam to post at rear patio. Provide truss calcs.
08/05/2026 COT - RSBU - Roof Nailing  Re-inspection required (with fee) 8-5-26: per SN1 Note G-All anchor bolts shall be installed with 3X3" washers, garage shear walls must be nailed at 4" o.c. along edges/joints 12" o.c. In the field, add nails to loose roof panel at entryway-see marked location.
08/06/2026 COT - RSBU - Roof Nailing  Passed 8-6-26: okay to dry-in