Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | ENGR Engineering Final | Not Ready | Both drain blocks in backyard are too high relative to grade to drain backyard correctly. Outstanding conditions need to be satisfied prior to final -air leakage and duct tightness -post tension slab -post install installed anchor inspection report -site preparation |
|
| 07/21/2026 | ENGR Engineering Final | Not Ready | 7/21/26 Grading in backyard is not complete. Excessive pooling-the drain blocks are too high in relation to the grade. Outstanding conditions need to be satisfied prior to the final. |