Inspection History Details
Inspection Status: Passed
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2026 | RSBU - Building Final | Passed | ||
| 07/15/2026 | RSBU - Building Final | Re-inspection required | 7-15-26 at main panel non-metallic plumbing is required to be checked yes or no. * garage wall door is not properly functioning. * remove paint off of 20 minute rated tag at garage door. * threshold that garage door must meet ADA requirements. * post tension tag required at hose bib. * was unable to walk attic due to needing a 10 foot ladder or better. | |
| 07/21/2026 | RSBU - Building Final | Re-inspection required | 7-21-26 remove paint off of 20 minute rated tag at garage door. * threshold at garage door must meet ADA requirements. * B vent must be properly fastened with both straps. | |
| 07/28/2026 | RSBU - Building Final | Partial Pass | 07/28/2026 Corrections made. Partial pass pending open conditions paperwork. |