Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2026 | ENGR Engineering Final | Not Ready | Site-work is complete in accordance with approved plans. 'Prior to Final' conditions have not yet been satisfied. | |
| 07/20/2026 | ENGR Engineering Final | Not Ready | Site is passes however- Outstanding conditions are not satisfied: -Air leakage and duct tightness -Concrete installation -Epoxy anchors -Post tension slab -Sewer release -Site preparation |