Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-0825-00458
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/20/2026 | ENGR Engineering Final | Not Ready | Ramp with landing required for use as a model. sales fencing prevents accessible route via garage. | |
| 02/12/2026 | ENGR Engineering Final | Not Ready | 2/12/26 TCO level 3 for display purposes only could be issued to this permit when there is an accessible route from the adjacent Commercial Office 7428 to the south. Accessible Routes are to be built from acceptable material with running slope that cannot exceed 5%. Cross slope cannot exceed 2%. If Ramps are used they cannot exceed 8.33 % and must have hand railings. Landings cannot exceed 2% in either direction and need to be at the same elevation as the Finished floor. Thresholds can't exceed 1/2". |
|
| 11/17/2025 | ENGR Engineering Final | Partial Pass | Okay for level 3 TCO for use as a sales model. |