Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/26/2026 |
ENGR Engineering Final
|
|
Re-inspection required |
Site does not maintain positive drainage away from the building foundation on the west and north sides - grade must slope in a way that takes water away from the foundation. Landscape is missing per plans - plants, irrigation, and water harvesting needs to be installed. |
| 07/16/2026 |
ENGR Engineering Final
|
|
Passed |
Drainage swale was added to meet code requirements. Site is complete in accordance with approved plans. |