Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2025 | ENGR Engineering Final | Passed | 1-3” clean out to right of front door needs to be trimmed and have a collar glued to pipe w/ cap. |