Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line and complete. Entire system under water test with no leaks. Okay to shade pipes and backfill trenches. |