Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | ENGR Engineering Final | Not Ready | Site has to be completed as per submitted plans. Dust proof parking and foot path are missing. Fencing at front? Port a jons need to be removed. Landscaping finished at front and rear. Addressing needs to be posted. |
|
| 08/06/2025 | ENGR Engineering Final | Re-inspection required | So we need a sidewalk from home to street side walk and a driveway apron between street and sidewalk to comply with the inclusive city ordnance. |