Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2023 | COT - RSPL - Rough Soil | Re-inspection required | Shower plumbing calls for 2". On site is 1" 1/2. 9/27/2023 | |
| 09/28/2023 | COT - RSPL - Rough Soil | Passed | Shower plumbing calls for 2". On site is 1" 1/2. 9/27/2023 9/28/23: correction made |