Inspection Status: Not Ready
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Not Ready |
|
| 06/07/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Not Ready |
Not ready. Loose shear walls at second floor. Add nails every 16" to bottom plates at second floor. 6/7/2024 |
| 06/11/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Re-inspection required |
Per previous notes. 6/11/2024 |
| 06/12/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
|