Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-0823-01418
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/25/2024 | ENGR Engineering Final | Not Ready | The landscaping is not complete. The basins are not complete. The grading in the back of the units are not complete. | |
11/27/2024 | ENGR Engineering Final | Partial Pass | contractor needs to finish putting in the DG , DG back in the alleyway the downspouts needs to be moved, so it does not hit the sidewalk area. And the tree staking. | |
12/03/2024 | ENGR Engineering Final | Partial Pass | Contractors good for TCO level four. Contractor needs to install two panel of fencing on the south east quadrant of building 18. | |
12/12/2024 | ENGR Engineering Final | Partial Pass | Okay for TCO level 4 |