Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2024 | RSBU - Building Final | Re-inspection required | 1/30/24: clean outs need to be cut to grade. Paint exterior pvc pipe. | |
| 01/31/2024 | RSBU - Building Final | Passed |