Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9/24/26: seal vapor barriers throughout- a few areas were marked, fire foam penetration at top plate near back sliding glass door, add nail plates at marked location & where closer than 1 1/4" from stud edge, secure pre line behind tub, add FHA plate at kitchen exhaust, provide supports above ceiling for restroom exhausts & DWV, add supports to ducts at 4' Intervals, tape duct tear at garage. |
| 09/25/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9-25-26 secure cold waterline behind tub* at marked locations add supports to ducts at 4' Intervals* DWV not under the test |
| 09/29/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
9-29-26 all corrections have been made OK to proceed |