Permit: TC-MDP-0726-00558

Parcel: 132131840


Addresses:

2675 S AYALA ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Roof NailingĀ 

Date Description Inspector Results Comments
10/05/2026 COT - RSBU - Roof NailingĀ  Re-inspection required 10-5-26 All shear wall eights are not nailed per schedule. 3 inches on center from edges and 12 inches on center in field missing 3 inches on center throughout.* sheer wall located on West wall nailing required to be no more than 3/8 of an inch from edge no more than 1/8 inch penetration at marked location* H2.5 not per schedule according to SD3.2-.3 stopped inspection at this time. Workers were present during the time of inspection, material and tools Also present throughout. Top floor was not walked nor was roof nailing walked, unable to locate truss calcs on site also not walked. Reinspection is required.
10/08/2026 COT - RSBU - Roof NailingĀ  Passed