Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/13/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2/13/26: ELECTRICAL CLEARANCE NOT READY (missing temp receptacle and cover plate at deathfront), missing circuits per approved plans ensure to submit revised plans with correct number of circuits, holiday lighting removed please submit on approved plans, nail plates required throughout, stud shoe required at south exterior bearing wall, properly support flex at 2nd floor, Horizontal ABS drain shall be supported every 4 feet, wiring at powder room exhaust fan shall be properly terminated. Insulation required at hot water lines 3/4"or large, properly support flex duct in closet, pex lines shall be properly supported at powder room,.
02/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2.20.26
Approved