Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | ENGR Engineering Final | Partial Pass | The scuppers from the roof drain are running off into the sidewalk. I spoke to Josh Garcia about it and took some photos and he’s going to call the contractor about it |
|
| 05/06/2026 | ENGR Engineering Final | Passed | Roof drainage at SFR door acceptable per Stephen Blood PE |