Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2024 | RSBU - Building Final | Re-inspection required | 2/9/24: waiting on engineering final. paint exterior pvc and cut clean out to grade. | |
| 02/14/2024 | RSBU - Building Final | Passed |