Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Provide 18" of copper at main water line and water heater. Secure loose pex lines. Remove drywall screws from angle stops. DWV not on test throughout 2nd floor. Secure vent lines and add nail plate to lines that are less than an 1 1/4". Secure hard ducts in place throughout. Block register on three sides. Seal exterior penetrations. Secure all loose electrical wires. Remove wires from can lights. Incomplete wiring above kitchen sink. Missing switch and light for closet first floor. Fire blocking underneath tub. Add nails or screws to interior walls. Add FHA plate to kitchen hood 2nd floor bottom plate. Fire foam top plate in garage area along with the back of panel. 10/4/2024 |
| 10/11/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
All corrections were made. 10/11/2024 |