Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Interior Shear BracingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 09/08/2026 |
COT - RSBU - Interior Shear BracingĀ |
|
Re-inspection required |
9-8-26 fasteners need to be no less then 3/8" from edge [throughout] fastener should not penetrate drywall more than eighth of an inch (1/8") also fasteners should be placed at 12 inches on center [throughout]. Please re-walk before calling it in. Shearwall was walked and is okay |
| 09/09/2026 |
COT - RSBU - Interior Shear BracingĀ |
|
Passed |
9-9-26 all items have been corrected |