Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
8/19/26: Nail plates required where (electrical,mechanical,plumbing) come within 1 1/4" of stud face, seal penetration through vapor barrier throughout (marked), seal penetration through top plate throughout (marked), exhaust duct must be supported 4' o.c throughout, supply/return air duct must be supported 4' o.c throughout, seal torn areas of duct throughout, properly support kitchen exhaust (positive pitch with proper straps), strap DWV midway at 2nd floor, 4-gang boxes require blocking, thermostat shall be no higher than 48" o.c, seal underground conduit for island, seal mechanical chase at 2nd floor and properly secure duct (seal torn areas), properly seal end caps at kitchen exhaust duct and plenum. DWV and Pex lines under pressure (passed), |
| 08/21/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
8-21-26 All items have been corrected. OK to continue |