Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/02/2026 ENGR Engineering Final Not Ready -Address number needs to be on upper wall facing Aircraft Rd for visibility.
-Cleanout needs to be trimmed and capped correctly so it is not a tripping hazard.
-Roof is not complete.
-Threshholds at Accessible Route entryways need to be beveled if over 1/4" in height and do not comply if over 1/2". -Currently threshholds do not comply.
-Accessible Route from sidewalk to entryways is good except at the landing at entryways. These need to extend 12" past latch side of doorway- Per 2017 ICC A117.1 Accessible and Usable Buildings and Facilities. Chapter 4. 404.2.3.2(B)
-Conditions that need to be satisfied Prior to final:
Air leakage and duct tightness
Sewer Release

Reschedule this inspection when ready
07/22/2026 ENGR Engineering Final Not Ready At east side of scupper/drainpipes under accessible route depress area so it is +/- .5 ft lower than other side next to building. This will allow the drainage to flow away from the foundation. The invert of these scuppers/drain should not be below the grade or they will clog and not function.
- Clearance to the weep screed on east side of building is not sufficient.
-Address Numbers facing street on house still missing
-Clean out needs to be trimmed.
-Fix landing at Accessible Route Entry (extend it 12” past latch side of door).
-There are conditions on the permit that need to be satisfied prior to final inspections:
Air leakage and duct tightness
Sewer Release
07/31/2026 ENGR Engineering Final Passed