Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Interior Shear Bracing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/10/2026 | COT - RSBU - Interior Shear Bracing | Partial Pass | 03/10/2026 Verified interior 5/8" type-x gypsum on both sides. Partial pass pending final exterior 5/8" type-x gypsum on both sides of duplex. Call in when drywall is up before tape & texture to verify nail schedule. |
|
| 03/11/2026 | COT - RSBU - Interior Shear Bracing | Canceled | 03/11/2026 Canceled at contractor request. |
|
| COT - RSBU - Interior Shear Bracing | Partial Pass | 3/16/2026 Partial pass. Okay to proceed with firewall insulation. Call in when completed drywall before covering screws. |
||
| 03/20/2026 | COT - RSBU - Interior Shear Bracing | Partial Pass | 3/20/2026 Verified top portion of firewall sealed completely, ok to proceed. Partial pending final drywall section before tape and texture. |
|
| 03/24/2026 | COT - RSBU - Interior Shear Bracing | Not Ready | ||
| 07/02/2026 | COT - RSBU - Interior Shear Bracing | Passed |