Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - RSBU - Interior Shear Bracing 

Date Description Inspector Results Comments
03/10/2026 COT - RSBU - Interior Shear Bracing  Partial Pass 03/10/2026
Verified interior 5/8" type-x gypsum on both sides. Partial pass pending final exterior 5/8" type-x gypsum on both sides of duplex. Call in when drywall is up before tape & texture to verify nail schedule.
03/11/2026 COT - RSBU - Interior Shear Bracing  Canceled 03/11/2026
Canceled at contractor request.
COT - RSBU - Interior Shear Bracing  Partial Pass 3/16/2026
Partial pass. Okay to proceed with firewall insulation. Call in when completed drywall before covering screws.
03/20/2026 COT - RSBU - Interior Shear Bracing  Partial Pass 3/20/2026
Verified top portion of firewall sealed completely, ok to proceed. Partial pending final drywall section before tape and texture.
03/24/2026 COT - RSBU - Interior Shear Bracing  Not Ready
07/02/2026 COT - RSBU - Interior Shear Bracing  Passed