Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
Permit Number - TC-MDP-0625-00353
Inspection Description - RSBU - Building Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | RSBU - Building Final | Re-inspection required | 2/13/26: open knock out at main panel, secure conduit at emt, properly terminate pressure relief valve, coat all exterior plastic piping, properly terminate gray water at south wall, properly secure liquid tight at ac, seal around disconnect box, remove paint from water hammer arrestor, support on electrical whip for garbage disposal, remove paint from fire rated door, water heater must be installed Including electrical), all inclusive home design requirements not met at garage at threshold, anti corrosive compound required at air handler disconnect, mark heat kit installed to verify correct amperage at air handler, lighting required at master bathroom Water closet. Seal knock out at. Air handler. | |
| 02/19/2026 | RSBU - Building Final | Passed | 2/19/26 corrections made |