Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2025 | BULD - Electrical Clearance | Re-inspection required | 11/12/25: over notched non-bearing studs must be corrected or replaced, damaged sheathing on electrical wiring must be addressed at main circuits coming in at south east corner, remove nm cable away from gusset plates, 4-gang boxes require blocking, exterior receptacles should be 12AWG cable for 20AMP circuit, seal all penetrations through vapor barrier at pantry, seal all penetrations through top plate at first floor, seal all plenum boxes at end cap, torn flex must be fixed, Boca plates required throughout. STOPPED INSPECTION. MORE ITEMS MAY BE ADDED (second floor was not walked). | |
| 11/14/2025 | BULD - Electrical Clearance | Passed | 11.14.2025 Clearance TEP ECO. |