Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0625-00352
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/12/25: over notched non-bearing studs must be corrected or replaced, damaged sheathing on electrical wiring must be addressed at main circuits coming in at south east corner, remove nm cable away from gusset plates, 4-gang boxes require blocking, exterior receptacles should be 12AWG cable for 20AMP circuit, seal all penetrations through vapor barrier at pantry, seal all penetrations through top plate at first floor, seal all plenum boxes at end cap, torn flex must be fixed, Boca plates required throughout. STOPPED INSPECTION. MORE ITEMS MAY BE ADDED (second floor was not walked). | ||
| 11/14/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.14.2025 All corrections made to 11.12.2025 inspection and foamed and added steel screws to upstairs fan boxes. |