Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | ENGR Engineering Final | Not Ready | 11/13/25 Drainage not correct on South side of building - not to plan. Weep joints for drainage at back wall are submerged. Both issues need to be fixed. |
|
| 11/18/2025 | ENGR Engineering Final | Passed |