Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 12/10/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
12-10-24, missing ufer at panel-install 2 ground rods minimum 6 feet apart, all h25's must be nailed at time of inspection, pancake box at garage coach light is rated for 6 cubic inches. There are 2 4/ awg wires and is overfilled. |
| 12/16/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12-16-24, intermediate inspection approved plans. Ok to continue with construction. |