Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2023 | ENGR Engineering Final | Partial Pass | The grading on the east side of the building is not completed | |
| 12/12/2023 | ENGR Engineering Final | Passed |