Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0623-01160

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required primary condensate line double trapped, master bathroom shower is leaking in to kitchen below. support duct registers on three sides at master bedroom, missing 2” WCO at master bathroom per P1 of plans.
01/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required missing nail plates left and right side of garage, brace and secure gas line in garage, nail plates needed at front door hallway, nail plate top plate at O.E., gas line testing below required PSI, nail plates needed at roomden, ufer installed incorrectly and loose, nail plate needed top plate at foyer closet, pex lines within 12” of can lights must be either moved or insulated, support 4-gang boxes, primary condensate line double trapped, add bang plates for vent and pipe in bedroom 2s closet top and bottom plate, fresh air intake must be 10, away from all vents, add nails to hanger in master bathroom, master bathroom shower not under test, support duct registers on three sides at master bedroom, missing 2” WCO at master bathroom per P1 of plans.