Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | ENGR Engineering Final | Not Ready | 1) Grade cert. not completed. 2) Grade at right side where AC units are does not look like it will drain. 3) left side mud coming up through landscape rocks. 4) Area at walk needs to be completed, landscape rock on walkway. 5) Sewer cap in driveway needs to be installed. |
|
| 04/02/2024 | ENGR Engineering Final | Passed | Grade cert passed but the right side of driveway has caved in and needs to be repaired Sewer cover in driveway missing |