Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0623-01145

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
11/21/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Panel not ready for electrical clearance, fire block penetration at top plate right side of garage, fire foam top plate in laundry, add more nails to bang plate for range vent, pex lines in first floor bathroom within 12” of can lights must be insulated, nail plates needed under dining window, electrical work in house not ready, support 4-gang box at top landing of stairs, add nails to h2.5 clip at closet/pantry to the right side of bedroom 2’s closet, fire foam top plate of bedroom 3’s closet.
11/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required fire block penetration at top plate right side of garage, fire foam top plate in laundry, add more nails to bang plate for range vent, fire foam top plate of bedroom 3’s closet.
11/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Electrical not per plans. Re-wire or proceed at risk and revise plans to show current layout of electrical work done and provide updated plans at final.
12/08/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed