Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Provide nail plates at lines that are less than an 1 1/4”. Provide two studs underneath girder truss in east bedroom. Add cripple stud at above header in second bedroom. DWV not under test. Add ground screw at metal boxes. Secure exhaust fan ducts midway throughout. Fire foam top plate penetrations. Ensure primary and secondary condensation lines have a pitch. Seal exterior penetrations. Add stud underneath double truss in great room and primary bath ends. Ensure t stats are at 48” prior to final. Missing wire at primary bedroom receptacle. Jacket in primary bath receptacle has been damaged. Replace fresh air intake due to water trapped and ensure it is secured. Provide nail plate at dryer duct. Seal underground conduit. Provide plans ok site prior to next visit. 7/29/2026 | |
| 08/05/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | 8-5-26: many corrections not complete. Missing ground screw at metal plates, receptacle not made up at master bedroom, fire foam kitchen exhausts, support flex at 4' intervals in master bedroom, condensation lines do not have a pitch, thermostat in bedroom not at 48" o.c., damaged jacket at master bathroom receptacle, secure hvac whip master bedroom, seal vapor barrier west wall master bedroom, secure dwv at laundry, fire foam service entry awg wires at entryway. Add stud underneath double truss in great room and primary bath ends. | |
| 08/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 8-6-26: canceled by contractor. | |
| 08/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 08/07/2026 Corrections made. |