Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
09/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9/27/24. Partial pass. Electrical is not wired to plan. Everything else is ok.
10/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9/27/24. Partial pass. Electrical is not wired to plan. Everything else is ok.
10-17-24, thermostats maximum height shall not exceed 54", missing wall receptacle in master bedroom per plan, property support pex in laundry that is hanging off 2x4,missing fire foam at panel in garage,install fha plate at dryer vent.
10/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-21-24: Electrical wiring has been corrected to match electrical panel schedule, missing outlet in master bedroom is installed, thermostat wiring has been lowered to 54", pex line in laundry is properly supported, and all penetrations have been foamed. Okay to proceed with installation of insulation and drywall.