Inspection History Details
Inspection Status: Failed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | ENGR Engineering Final | Failed | Sewer Clean out collar is not glued to pipe. | |
| 07/31/2025 | ENGR Engineering Final | Passed |