Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/09/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Add nail plates to feeders in garage. Add blocking to all registers. Add nail plates to electrical lines that are less than an 1 1/4". Add FHA plate behind kitchen hood. Staple punctured through ABS pipe at master bath exterior pipe. Receptacles are not made up. STOPPED INSPECTION. Other items may be added. 9/9/2024 |
| 09/13/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
Partial pass. Incorrect wire size for garage receptacles. 9/13/2024 |
| 09/16/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|