Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | ENGR Engineering Final | Not Ready | PAG SD 206 Driveway not in. This needs right of way permit. Accessible Route to front Door in accordance with The Inclusive Home Ordinance not in place. This route would need comply with ADA. I recommend submitting revised site plan showing the route and driveway details to this MDP permit for approval . |
|
| 10/17/2025 | ENGR Engineering Final | Not Ready | 10/17/25 Accessible Routes to both units are not ADA compliant. Some of the sidewalk panels slope are over 5%. The landings in front of the doors are below grade of the finished floor by over an inch. Landings at door cannot be sloped either way more than 2%. |
|
| 10/24/2025 | ENGR Engineering Final | Not Ready | Numbers correspond with numbered, attached pictures. 1. Subgrade is not compacted correctly. Footprints, soft/loose. Both Accessible Routes need to be compacted Correctly. 2. South Accessible Route. Landing at door over 2%. Fix this. Slope away from house but under 2%. 3. South Accessible Route, Left of door, next to house. Forms here are over 5%- they are 7.2%. The landing where route changes direction needs to be raised so this slope does not exceed 5% to fix this. The landing cannot exceed 2%, both ways . 4. South Accessible Route. Going down to street sidewalk....Here slope is 3.7%. If landing where route changes direction is raised, this slope should still remain 5% or under if it remains consistent down to street. |
|
| 11/03/2025 | ENGR Engineering Final | Passed |