Inspection Status: Partial Pass

Inspection History: COT - LCBU - Framing

Date Description Inspector Results Comments
02/26/2024 COT - LCBU - Framing Partial Pass 2/26/24: framing at exterior clips and sheathing completed. Pending framing at intermediates.
03/12/2024 COT - LCBU - Framing Partial Pass 2/26/24: framing at exterior clips and sheathing completed. Pending framing at intermediates.
3/12/24: RFI for shot pins at first floor shear walls complete.
04/10/2024 COT - LCBU - Framing Canceled 2/26/24: framing at exterior clips and sheathing completed. Pending framing at intermediates.
3/12/24: RFI for shot pins at first floor shear walls complete.
4/10/24: Canceled per Jacob
04/11/2024 COT - LCBU - Framing Partial Pass 2/26/24: framing at exterior clips and sheathing completed. Pending framing at intermediates.
3/12/24: RFI for shot pins at first floor shear walls complete.
4/10/24: Canceled per Jacob
4/11/24: over notched bearing stud needs to replaced at third floor.
04/19/2024 COT - LCBU - Framing Passed